INTEGRITY AND RISK ASSESSMENT OF RECONSTRUCTED STEAM LINE

Jovanović, Aleksandar; Bakić, Gordana; Golubović, Tamara; Kirin, Snežana; Sedmak, Aleksandar

(Society for Structural Integrity and Life (DIVK), 2023)

TY  - JOUR
AU  - Jovanović, Aleksandar
AU  - Bakić, Gordana
AU  - Golubović, Tamara
AU  - Kirin, Snežana
AU  - Sedmak, Aleksandar
PY  - 2023
UR  - http://TechnoRep.tmf.bg.ac.rs/handle/123456789/7153
AB  - The integrity assessment of high pressure steam pipeline
primarily requires stress state determination, including not
only effects of working pressure and temperature, but also
all acting loads. Toward this aim, the application of numerical methods for calculating the stress state is the best option.
Here, the integrity assessment of one of the collectors of the
RA line at Block 1 of ‘Nikola Tesla’ B Thermal Power Plant
is shown, which was the subject of reconstruction due to a
manufacturing defect in one of the welded joints. Integrity
and risk of the steam line is assessed using fracture
mechanics parameters, including microstructural analysis.
AB  - Procena integriteta parovoda pod visokim pritiskom zahteva prvenstveno utvrđivanje naponskog stanja materijala,
pri čemu treba uzeti u obzir ne samo uticaj radnog pritiska
i temperature, već i sva delujuća opterećenja. Primena neke
od numeričkih metoda proračuna za analizu naponskog
stanja je najbolji alat. Ovde je prikazana je procena integriteta jednog od kolektora RA linije na Bloku 1 Termoelektrane ’Nikola Tesla’ B koji je bio predmet rekonstrukcije
zbog greške na jednom od zavarenih spojeva. Integritet i
rizik parovoda je procenjen primenom parametra mehanike
loma, uz analizu mikrostrukture.
PB  - Society for Structural Integrity and Life (DIVK)
T2  - Structural Integrity and Life
T1  - INTEGRITY AND RISK ASSESSMENT OF RECONSTRUCTED STEAM LINE
T1  - PROCENA INTEGRITETA I RIZIKA REKONSTRUISANOG PAROVODA
EP  - 371
IS  - 3
SP  - 367
VL  - 23
UR  - https://hdl.handle.net/21.15107/rcub_technorep_7153
ER  - 
@article{
author = "Jovanović, Aleksandar and Bakić, Gordana and Golubović, Tamara and Kirin, Snežana and Sedmak, Aleksandar",
year = "2023",
abstract = "The integrity assessment of high pressure steam pipeline
primarily requires stress state determination, including not
only effects of working pressure and temperature, but also
all acting loads. Toward this aim, the application of numerical methods for calculating the stress state is the best option.
Here, the integrity assessment of one of the collectors of the
RA line at Block 1 of ‘Nikola Tesla’ B Thermal Power Plant
is shown, which was the subject of reconstruction due to a
manufacturing defect in one of the welded joints. Integrity
and risk of the steam line is assessed using fracture
mechanics parameters, including microstructural analysis., Procena integriteta parovoda pod visokim pritiskom zahteva prvenstveno utvrđivanje naponskog stanja materijala,
pri čemu treba uzeti u obzir ne samo uticaj radnog pritiska
i temperature, već i sva delujuća opterećenja. Primena neke
od numeričkih metoda proračuna za analizu naponskog
stanja je najbolji alat. Ovde je prikazana je procena integriteta jednog od kolektora RA linije na Bloku 1 Termoelektrane ’Nikola Tesla’ B koji je bio predmet rekonstrukcije
zbog greške na jednom od zavarenih spojeva. Integritet i
rizik parovoda je procenjen primenom parametra mehanike
loma, uz analizu mikrostrukture.",
publisher = "Society for Structural Integrity and Life (DIVK)",
journal = "Structural Integrity and Life",
title = "INTEGRITY AND RISK ASSESSMENT OF RECONSTRUCTED STEAM LINE, PROCENA INTEGRITETA I RIZIKA REKONSTRUISANOG PAROVODA",
pages = "371-367",
number = "3",
volume = "23",
url = "https://hdl.handle.net/21.15107/rcub_technorep_7153"
}
Jovanović, A., Bakić, G., Golubović, T., Kirin, S.,& Sedmak, A.. (2023). INTEGRITY AND RISK ASSESSMENT OF RECONSTRUCTED STEAM LINE. in Structural Integrity and Life
Society for Structural Integrity and Life (DIVK)., 23(3), 367-371.
https://hdl.handle.net/21.15107/rcub_technorep_7153
Jovanović A, Bakić G, Golubović T, Kirin S, Sedmak A. INTEGRITY AND RISK ASSESSMENT OF RECONSTRUCTED STEAM LINE. in Structural Integrity and Life. 2023;23(3):367-371.
https://hdl.handle.net/21.15107/rcub_technorep_7153 .
Jovanović, Aleksandar, Bakić, Gordana, Golubović, Tamara, Kirin, Snežana, Sedmak, Aleksandar, "INTEGRITY AND RISK ASSESSMENT OF RECONSTRUCTED STEAM LINE" in Structural Integrity and Life, 23, no. 3 (2023):367-371,
https://hdl.handle.net/21.15107/rcub_technorep_7153 .

NUMERICAL, ANALYTICAL AND EXPERIMENTAL DETERMINATION OF REMAINING LIFE OF A PIPE WITH AN AXIAL CRACK

Sedmak, Aleksandar; Grbović, Aleksandar; Zaidi, Radzeya; Kirin, Snežana; Vitas, Nikola; Golubović, Tamara; Vučetić, Ivana

(Society for Structural Integrity and Life (DIVK), 2023)

TY  - JOUR
AU  - Sedmak, Aleksandar
AU  - Grbović, Aleksandar
AU  - Zaidi, Radzeya
AU  - Kirin, Snežana
AU  - Vitas, Nikola
AU  - Golubović, Tamara
AU  - Vučetić, Ivana
PY  - 2023
UR  - http://TechnoRep.tmf.bg.ac.rs/handle/123456789/7154
AB  - Numerical and analytical methods are applied to determine the remaining life of oil rig pipe with an axial crack.
Analytical expressions for surface cracks are used to calculate stress intensity factors for different crack geometries
and estimate the remaining life directly by using Paris law.
The same procedure is applied by using the FEM, verified
previously by experimental results. Good agreement between
analytical and numerical results is demonstrated.
AB  - Primenjene su numeričke i analitičke metode za određivanje preostalog veka cevi naftne platforme sa aksijalnom
prslinom. Analitički izrazi za površinske prsline korišćeni
su za izračunavanje faktora intenziteta napona za različite
geometrije prsline i za procenu preostalog veka korišćenjem Parisovog zakona. Isti postupak je primenjen korišćenjem MKE, prethodno verifikovan eksperimentom. Pokazano je dobro slaganje analitičkih i numeričkih rezultata.
PB  - Society for Structural Integrity and Life (DIVK)
T2  - Structural Integrity and Life
T1  - NUMERICAL, ANALYTICAL AND EXPERIMENTAL DETERMINATION OF REMAINING LIFE OF A PIPE WITH AN AXIAL CRACK
T1  - NUMERIČKO, ANALITIČKO I EKSPERIMENTALNO ODREĐIVANJE PREOSTALOG VEKA CEVI SA OSNOM PRSLINOM
EP  - 244
IS  - 3
SP  - 239
VL  - 23
UR  - https://hdl.handle.net/21.15107/rcub_technorep_7154
ER  - 
@article{
author = "Sedmak, Aleksandar and Grbović, Aleksandar and Zaidi, Radzeya and Kirin, Snežana and Vitas, Nikola and Golubović, Tamara and Vučetić, Ivana",
year = "2023",
abstract = "Numerical and analytical methods are applied to determine the remaining life of oil rig pipe with an axial crack.
Analytical expressions for surface cracks are used to calculate stress intensity factors for different crack geometries
and estimate the remaining life directly by using Paris law.
The same procedure is applied by using the FEM, verified
previously by experimental results. Good agreement between
analytical and numerical results is demonstrated., Primenjene su numeričke i analitičke metode za određivanje preostalog veka cevi naftne platforme sa aksijalnom
prslinom. Analitički izrazi za površinske prsline korišćeni
su za izračunavanje faktora intenziteta napona za različite
geometrije prsline i za procenu preostalog veka korišćenjem Parisovog zakona. Isti postupak je primenjen korišćenjem MKE, prethodno verifikovan eksperimentom. Pokazano je dobro slaganje analitičkih i numeričkih rezultata.",
publisher = "Society for Structural Integrity and Life (DIVK)",
journal = "Structural Integrity and Life",
title = "NUMERICAL, ANALYTICAL AND EXPERIMENTAL DETERMINATION OF REMAINING LIFE OF A PIPE WITH AN AXIAL CRACK, NUMERIČKO, ANALITIČKO I EKSPERIMENTALNO ODREĐIVANJE PREOSTALOG VEKA CEVI SA OSNOM PRSLINOM",
pages = "244-239",
number = "3",
volume = "23",
url = "https://hdl.handle.net/21.15107/rcub_technorep_7154"
}
Sedmak, A., Grbović, A., Zaidi, R., Kirin, S., Vitas, N., Golubović, T.,& Vučetić, I.. (2023). NUMERICAL, ANALYTICAL AND EXPERIMENTAL DETERMINATION OF REMAINING LIFE OF A PIPE WITH AN AXIAL CRACK. in Structural Integrity and Life
Society for Structural Integrity and Life (DIVK)., 23(3), 239-244.
https://hdl.handle.net/21.15107/rcub_technorep_7154
Sedmak A, Grbović A, Zaidi R, Kirin S, Vitas N, Golubović T, Vučetić I. NUMERICAL, ANALYTICAL AND EXPERIMENTAL DETERMINATION OF REMAINING LIFE OF A PIPE WITH AN AXIAL CRACK. in Structural Integrity and Life. 2023;23(3):239-244.
https://hdl.handle.net/21.15107/rcub_technorep_7154 .
Sedmak, Aleksandar, Grbović, Aleksandar, Zaidi, Radzeya, Kirin, Snežana, Vitas, Nikola, Golubović, Tamara, Vučetić, Ivana, "NUMERICAL, ANALYTICAL AND EXPERIMENTAL DETERMINATION OF REMAINING LIFE OF A PIPE WITH AN AXIAL CRACK" in Structural Integrity and Life, 23, no. 3 (2023):239-244,
https://hdl.handle.net/21.15107/rcub_technorep_7154 .
1

Crane stoppages risk assessment

Brkić, Aleksandar; Misita, Mirjana; Spasojević Brkić, Vesna; Golubović, Tamara; Papić, Neda; Perišić, Martina

(Society for Structural Integrity and Life (DIVK), 2022)

TY  - JOUR
AU  - Brkić, Aleksandar
AU  - Misita, Mirjana
AU  - Spasojević Brkić, Vesna
AU  - Golubović, Tamara
AU  - Papić, Neda
AU  - Perišić, Martina
PY  - 2022
UR  - http://TechnoRep.tmf.bg.ac.rs/handle/123456789/6323
AB  - According to available literature, safety at work and productivity of cranes are a necessary and insufficiently researched topic. Both research directions are closely related because they depend on the number and type of stoppages that occur during operation of these construction machines. The focus of research should be on identifying the stoppages that can have fatal consequences for employees on-site, or unintended consequences in terms of production loss, means of work, or environment. In the present research, an attempt is made to create a methodology for identification, analysis, assessment, classification, and calculation of stoppage risk in cranes (classified by categories and causes). Criteria used for analysis, assessment, and calculation of stoppage risk: degree of stoppage danger, frequency of stoppage classified according to stoppage categories/causes, and downtime according to the adopted classification. Experimental research on a sample of 1,091 stoppages recorded on several cranes over a longer time interval has confirmed the hypothesis of generating a 3-criterion matrix for stoppage risk assessment sensitive enough to prioritise key crane stoppage in terms of risk. Results of experimental research indicate mechanical downtime of 16.22 %, a frequency 45.35 % in downtime, and RPN number 80, at hazard level 10. Selectively, according to the cause of stoppage, the results indicate that the hoisting brake (6.48 % downtime at hazard level 10; 2.14 % stoppage frequency) and hoist gear/tooth breakage (5.29 % downtime at hazard level 10; 3.58 % stoppage frequency) are key mechanical causes of stoppages and crane risk generators. By mitigating the given risks, it is possible to improve safety and increase productivity.
AB  - Prema dostupnoj literaturi, bezbednost u radu i produktivnost dizalica je potrebna i nedovoljno proučena oblast. Oba pravca istraživanja su u bliskoj vezi jer zavise od broja i tipa zastoja koji se događaju u toku rada ovih mašinskih konstrukcija. Predmet istraživanja treba da bude u identifikaciji ovih zastoja, koji mogu imati fatalni ishod po zaposlene na terenu, ili nepredviđene posledice u smislu proizvodnih gubitaka, radnih sredstava, ili na okolinu. U radu je predstavljena izrada metodologije za identifikaciju, analizu, procenu, klasifikaciju i proračun rizika zastoja (sa klasifikacijom prema kategoriji i uzroku) kod dizalica. Kriterijumi upotrebljeni za analizu, procenu i proračun rizika zastoja su: stepen opasnosti zastoja, frekvencija zastoja sa klasifikacijom prema kategorijama/uzrocima zastoja, kao i vreme prekida, prema usvojenoj klasifikaciji. Eksperimentalno istraživanje na uzorku od 1091 zastoja, zabeleženih kod nekoliko dizalica tokom dužeg perioda potvrđuje hipotezu o generisanju 3-kriterijumske matrice za procenu rizika zastoja, dovoljno osetljivom, kako bi se dao prioritet ključnim zastojima kod dizalice s obzirom na rizik. Rezultati eksperimentalnog istraživanja pokazuju period mehaničkih prekida rada sa procentom 16.22 % i frekvencijom 45.35 % u vremenu prekida, sa brojem RPN od 80, pri nivou rizika 10. Selektivno, a prema uzroku zastoja, rezultati pokazuju da su: kočnice (6.48 % vreme prekida sa nivoom rizika 10; 2.14 % frekvencije zastoja), zatim otkazi prenosnika/zubaca (5.29 % vreme prekida, sa nivoom rizika 10; 3.58 % frekvencije zastoja), ključni mehanički uzročnici zastoja i generatori rizika dizalica. Ublažavanjem datih rizika, moguće je poboljšati bezbednost i povećati produktivnost.
PB  - Society for Structural Integrity and Life (DIVK)
T2  - Structural Integrity and Life
T1  - Crane stoppages risk assessment
T1  - Procena rizika zastoja dizalica
EP  - 346
IS  - 3
SP  - 339
VL  - 22
UR  - https://hdl.handle.net/21.15107/rcub_technorep_6323
ER  - 
@article{
author = "Brkić, Aleksandar and Misita, Mirjana and Spasojević Brkić, Vesna and Golubović, Tamara and Papić, Neda and Perišić, Martina",
year = "2022",
abstract = "According to available literature, safety at work and productivity of cranes are a necessary and insufficiently researched topic. Both research directions are closely related because they depend on the number and type of stoppages that occur during operation of these construction machines. The focus of research should be on identifying the stoppages that can have fatal consequences for employees on-site, or unintended consequences in terms of production loss, means of work, or environment. In the present research, an attempt is made to create a methodology for identification, analysis, assessment, classification, and calculation of stoppage risk in cranes (classified by categories and causes). Criteria used for analysis, assessment, and calculation of stoppage risk: degree of stoppage danger, frequency of stoppage classified according to stoppage categories/causes, and downtime according to the adopted classification. Experimental research on a sample of 1,091 stoppages recorded on several cranes over a longer time interval has confirmed the hypothesis of generating a 3-criterion matrix for stoppage risk assessment sensitive enough to prioritise key crane stoppage in terms of risk. Results of experimental research indicate mechanical downtime of 16.22 %, a frequency 45.35 % in downtime, and RPN number 80, at hazard level 10. Selectively, according to the cause of stoppage, the results indicate that the hoisting brake (6.48 % downtime at hazard level 10; 2.14 % stoppage frequency) and hoist gear/tooth breakage (5.29 % downtime at hazard level 10; 3.58 % stoppage frequency) are key mechanical causes of stoppages and crane risk generators. By mitigating the given risks, it is possible to improve safety and increase productivity., Prema dostupnoj literaturi, bezbednost u radu i produktivnost dizalica je potrebna i nedovoljno proučena oblast. Oba pravca istraživanja su u bliskoj vezi jer zavise od broja i tipa zastoja koji se događaju u toku rada ovih mašinskih konstrukcija. Predmet istraživanja treba da bude u identifikaciji ovih zastoja, koji mogu imati fatalni ishod po zaposlene na terenu, ili nepredviđene posledice u smislu proizvodnih gubitaka, radnih sredstava, ili na okolinu. U radu je predstavljena izrada metodologije za identifikaciju, analizu, procenu, klasifikaciju i proračun rizika zastoja (sa klasifikacijom prema kategoriji i uzroku) kod dizalica. Kriterijumi upotrebljeni za analizu, procenu i proračun rizika zastoja su: stepen opasnosti zastoja, frekvencija zastoja sa klasifikacijom prema kategorijama/uzrocima zastoja, kao i vreme prekida, prema usvojenoj klasifikaciji. Eksperimentalno istraživanje na uzorku od 1091 zastoja, zabeleženih kod nekoliko dizalica tokom dužeg perioda potvrđuje hipotezu o generisanju 3-kriterijumske matrice za procenu rizika zastoja, dovoljno osetljivom, kako bi se dao prioritet ključnim zastojima kod dizalice s obzirom na rizik. Rezultati eksperimentalnog istraživanja pokazuju period mehaničkih prekida rada sa procentom 16.22 % i frekvencijom 45.35 % u vremenu prekida, sa brojem RPN od 80, pri nivou rizika 10. Selektivno, a prema uzroku zastoja, rezultati pokazuju da su: kočnice (6.48 % vreme prekida sa nivoom rizika 10; 2.14 % frekvencije zastoja), zatim otkazi prenosnika/zubaca (5.29 % vreme prekida, sa nivoom rizika 10; 3.58 % frekvencije zastoja), ključni mehanički uzročnici zastoja i generatori rizika dizalica. Ublažavanjem datih rizika, moguće je poboljšati bezbednost i povećati produktivnost.",
publisher = "Society for Structural Integrity and Life (DIVK)",
journal = "Structural Integrity and Life",
title = "Crane stoppages risk assessment, Procena rizika zastoja dizalica",
pages = "346-339",
number = "3",
volume = "22",
url = "https://hdl.handle.net/21.15107/rcub_technorep_6323"
}
Brkić, A., Misita, M., Spasojević Brkić, V., Golubović, T., Papić, N.,& Perišić, M.. (2022). Crane stoppages risk assessment. in Structural Integrity and Life
Society for Structural Integrity and Life (DIVK)., 22(3), 339-346.
https://hdl.handle.net/21.15107/rcub_technorep_6323
Brkić A, Misita M, Spasojević Brkić V, Golubović T, Papić N, Perišić M. Crane stoppages risk assessment. in Structural Integrity and Life. 2022;22(3):339-346.
https://hdl.handle.net/21.15107/rcub_technorep_6323 .
Brkić, Aleksandar, Misita, Mirjana, Spasojević Brkić, Vesna, Golubović, Tamara, Papić, Neda, Perišić, Martina, "Crane stoppages risk assessment" in Structural Integrity and Life, 22, no. 3 (2022):339-346,
https://hdl.handle.net/21.15107/rcub_technorep_6323 .

Differences in attitudes of operators and managers on risk management of pressure equipment

Golubović, Tamara; Spasojević Brkić, Vesna; Perišić, Martina; Brkić, Aleksandar

(Taylor and Francis Ltd., 2022)

TY  - JOUR
AU  - Golubović, Tamara
AU  - Spasojević Brkić, Vesna
AU  - Perišić, Martina
AU  - Brkić, Aleksandar
PY  - 2022
UR  - http://TechnoRep.tmf.bg.ac.rs/handle/123456789/4997
AB  - Objectives. Previous research indicates that models for risk assessment of pressure equipment have not sufficiently or adequately integrated indicators of human factors and organizational factors. Methods. The goal of this article is to check the differences in attitudes of operators and managers engaged in the area of pressure equipment risk management. A questionnaire was designed and data were then collected from 253 operators and managers working with the same pressure equipment in Serbia. By applying a paired t test, differences in their attitudes were checked for issues described by the constructs of communication (COM), potentially hazardous materials and equipment (PHME), process safety (PS), safety and health at work (SHW), organizational change management (OCM), maintenance/inspection (MI) procedures, human error (HE), trainings and competences of employees for crisis situations (TCECS) and conducting research after accidents (CRAA). Results. It is statistically evident that the coincidence of attitudes accounted for less than 20% of questions. The highest coincidence is shown for PHME and TCECS, where one-half of the dimensions of the given constructs indicate that there are no statistically significant differences. Conclusions. The differences found could be used as an explanation for high-risk levels of pressure equipment exploitation and how they influence it.
PB  - Taylor and Francis Ltd.
T2  - International Journal of Occupational Safety and Ergonomics
T1  - Differences in attitudes of operators and managers on risk management of pressure equipment
EP  - 1801
IS  - 3
SP  - 1793
VL  - 28
DO  - 10.1080/10803548.2021.1937795
ER  - 
@article{
author = "Golubović, Tamara and Spasojević Brkić, Vesna and Perišić, Martina and Brkić, Aleksandar",
year = "2022",
abstract = "Objectives. Previous research indicates that models for risk assessment of pressure equipment have not sufficiently or adequately integrated indicators of human factors and organizational factors. Methods. The goal of this article is to check the differences in attitudes of operators and managers engaged in the area of pressure equipment risk management. A questionnaire was designed and data were then collected from 253 operators and managers working with the same pressure equipment in Serbia. By applying a paired t test, differences in their attitudes were checked for issues described by the constructs of communication (COM), potentially hazardous materials and equipment (PHME), process safety (PS), safety and health at work (SHW), organizational change management (OCM), maintenance/inspection (MI) procedures, human error (HE), trainings and competences of employees for crisis situations (TCECS) and conducting research after accidents (CRAA). Results. It is statistically evident that the coincidence of attitudes accounted for less than 20% of questions. The highest coincidence is shown for PHME and TCECS, where one-half of the dimensions of the given constructs indicate that there are no statistically significant differences. Conclusions. The differences found could be used as an explanation for high-risk levels of pressure equipment exploitation and how they influence it.",
publisher = "Taylor and Francis Ltd.",
journal = "International Journal of Occupational Safety and Ergonomics",
title = "Differences in attitudes of operators and managers on risk management of pressure equipment",
pages = "1801-1793",
number = "3",
volume = "28",
doi = "10.1080/10803548.2021.1937795"
}
Golubović, T., Spasojević Brkić, V., Perišić, M.,& Brkić, A.. (2022). Differences in attitudes of operators and managers on risk management of pressure equipment. in International Journal of Occupational Safety and Ergonomics
Taylor and Francis Ltd.., 28(3), 1793-1801.
https://doi.org/10.1080/10803548.2021.1937795
Golubović T, Spasojević Brkić V, Perišić M, Brkić A. Differences in attitudes of operators and managers on risk management of pressure equipment. in International Journal of Occupational Safety and Ergonomics. 2022;28(3):1793-1801.
doi:10.1080/10803548.2021.1937795 .
Golubović, Tamara, Spasojević Brkić, Vesna, Perišić, Martina, Brkić, Aleksandar, "Differences in attitudes of operators and managers on risk management of pressure equipment" in International Journal of Occupational Safety and Ergonomics, 28, no. 3 (2022):1793-1801,
https://doi.org/10.1080/10803548.2021.1937795 . .
3
1

Effects of Over-Loading on Pressure Vessel Integrity

Sedmak, Aleksandar; Martić, Igor; Jeremić, Lazar; Kirin, Snežana; Golubović, Tamara

(Elsevier B.V., 2022)

TY  - CONF
AU  - Sedmak, Aleksandar
AU  - Martić, Igor
AU  - Jeremić, Lazar
AU  - Kirin, Snežana
AU  - Golubović, Tamara
PY  - 2022
UR  - http://TechnoRep.tmf.bg.ac.rs/handle/123456789/6430
AB  - The effect of proof over-pressure on pressure vessels structural integrity is analysed. Risk based approach is applied using Failure Analysis Diagramme to assess likelihood of failure. Special attention is paid to crack-like defects detected by NDT regular testing which are unacceptable by standards, but difficult to be repaired. It was show, using two examples, that such defects can remain if some strict conditions are fulfilled. In any case, with or without crack-like defects, it was shown that testing of pressure vessels with significant over-pressure can cause much more problems than it has benefits, because it acts more like the first step in eventual failure, than being proof to anything.
PB  - Elsevier B.V.
C3  - 23rd European Conference on Fracture, ECF 2022, Procedia Structural Integrity
T1  - Effects of Over-Loading on Pressure Vessel Integrity
EP  - 361
SP  - 356
VL  - 42
DO  - 10.1016/j.prostr.2022.12.044
ER  - 
@conference{
author = "Sedmak, Aleksandar and Martić, Igor and Jeremić, Lazar and Kirin, Snežana and Golubović, Tamara",
year = "2022",
abstract = "The effect of proof over-pressure on pressure vessels structural integrity is analysed. Risk based approach is applied using Failure Analysis Diagramme to assess likelihood of failure. Special attention is paid to crack-like defects detected by NDT regular testing which are unacceptable by standards, but difficult to be repaired. It was show, using two examples, that such defects can remain if some strict conditions are fulfilled. In any case, with or without crack-like defects, it was shown that testing of pressure vessels with significant over-pressure can cause much more problems than it has benefits, because it acts more like the first step in eventual failure, than being proof to anything.",
publisher = "Elsevier B.V.",
journal = "23rd European Conference on Fracture, ECF 2022, Procedia Structural Integrity",
title = "Effects of Over-Loading on Pressure Vessel Integrity",
pages = "361-356",
volume = "42",
doi = "10.1016/j.prostr.2022.12.044"
}
Sedmak, A., Martić, I., Jeremić, L., Kirin, S.,& Golubović, T.. (2022). Effects of Over-Loading on Pressure Vessel Integrity. in 23rd European Conference on Fracture, ECF 2022, Procedia Structural Integrity
Elsevier B.V.., 42, 356-361.
https://doi.org/10.1016/j.prostr.2022.12.044
Sedmak A, Martić I, Jeremić L, Kirin S, Golubović T. Effects of Over-Loading on Pressure Vessel Integrity. in 23rd European Conference on Fracture, ECF 2022, Procedia Structural Integrity. 2022;42:356-361.
doi:10.1016/j.prostr.2022.12.044 .
Sedmak, Aleksandar, Martić, Igor, Jeremić, Lazar, Kirin, Snežana, Golubović, Tamara, "Effects of Over-Loading on Pressure Vessel Integrity" in 23rd European Conference on Fracture, ECF 2022, Procedia Structural Integrity, 42 (2022):356-361,
https://doi.org/10.1016/j.prostr.2022.12.044 . .
1
1

Risk based analysis of RHPP penstock structural integrity

Kirin, Snežana; Jeremić, Lazar; Sedmak, Aleksandar; Martić, Igor; Sedmak, Simon; Vucetić, Ivana; Golubović, Tamara

(Gruppo Italiano Frattura, Cassino, 2020)

TY  - JOUR
AU  - Kirin, Snežana
AU  - Jeremić, Lazar
AU  - Sedmak, Aleksandar
AU  - Martić, Igor
AU  - Sedmak, Simon
AU  - Vucetić, Ivana
AU  - Golubović, Tamara
PY  - 2020
UR  - http://TechnoRep.tmf.bg.ac.rs/handle/123456789/4383
AB  - Risk based analysis of reverse hydro power plant penstock structural integrity is performed using fracture mechanics parameters. To assess its structural integrity, extensive testing of the full-scale prototype had been performed, including hydrostatic over-pressurizing, during the design phase. More recently, the Failure Assessment Diagram has been used to evaluate probability, whereas phenomenological analysis has been used to estimate consequence, in the scope of common risk estimation. It is shown that over-pressuring has potential detrimental effect on pipeline safety, i.e. structural integrity.
PB  - Gruppo Italiano Frattura, Cassino
T2  - Frattura Ed Integrita Strutturale
T1  - Risk based analysis of RHPP penstock structural integrity
EP  - 352
IS  - 53
SP  - 345
DO  - 10.3221/IGF-ESIS.53.27
ER  - 
@article{
author = "Kirin, Snežana and Jeremić, Lazar and Sedmak, Aleksandar and Martić, Igor and Sedmak, Simon and Vucetić, Ivana and Golubović, Tamara",
year = "2020",
abstract = "Risk based analysis of reverse hydro power plant penstock structural integrity is performed using fracture mechanics parameters. To assess its structural integrity, extensive testing of the full-scale prototype had been performed, including hydrostatic over-pressurizing, during the design phase. More recently, the Failure Assessment Diagram has been used to evaluate probability, whereas phenomenological analysis has been used to estimate consequence, in the scope of common risk estimation. It is shown that over-pressuring has potential detrimental effect on pipeline safety, i.e. structural integrity.",
publisher = "Gruppo Italiano Frattura, Cassino",
journal = "Frattura Ed Integrita Strutturale",
title = "Risk based analysis of RHPP penstock structural integrity",
pages = "352-345",
number = "53",
doi = "10.3221/IGF-ESIS.53.27"
}
Kirin, S., Jeremić, L., Sedmak, A., Martić, I., Sedmak, S., Vucetić, I.,& Golubović, T.. (2020). Risk based analysis of RHPP penstock structural integrity. in Frattura Ed Integrita Strutturale
Gruppo Italiano Frattura, Cassino.(53), 345-352.
https://doi.org/10.3221/IGF-ESIS.53.27
Kirin S, Jeremić L, Sedmak A, Martić I, Sedmak S, Vucetić I, Golubović T. Risk based analysis of RHPP penstock structural integrity. in Frattura Ed Integrita Strutturale. 2020;(53):345-352.
doi:10.3221/IGF-ESIS.53.27 .
Kirin, Snežana, Jeremić, Lazar, Sedmak, Aleksandar, Martić, Igor, Sedmak, Simon, Vucetić, Ivana, Golubović, Tamara, "Risk based analysis of RHPP penstock structural integrity" in Frattura Ed Integrita Strutturale, no. 53 (2020):345-352,
https://doi.org/10.3221/IGF-ESIS.53.27 . .
7
4
12

Integration of human and organizational factors in the risk and integrity assessment model for pressure equipment

Golubović, Tamara

(Univerzitet u Beogradu, Mašinski fakultet, 2018)

TY  - THES
AU  - Golubović, Tamara
PY  - 2018
UR  - http://eteze.bg.ac.rs/application/showtheses?thesesId=5872
UR  - https://fedorabg.bg.ac.rs/fedora/get/o:17786/bdef:Content/download
UR  - http://vbs.rs/scripts/cobiss?command=DISPLAY&base=70036&RID=514934947
UR  - http://TechnoRep.tmf.bg.ac.rs/handle/123456789/4671
AB  - The goal of this doctoral dissertation is establishing of an the original methodology for risk assessment of the pressure equipment, based on fracture mechanics, and influence of human and organisational factors. The methodology was based on systemisation of existing knowledge in the fields of process safety, inovation of existing tools and models for risk assessment, improvement of general pressure equipment exploitation and fracture mechanics, and solving the main disadvantages present in these areas, their simplification and adapting to practical application, with an emphasis on solving the issues related to a lack of a systematic and practical approach to determine influence of the human and organisational factors...
AB  - Predmet doktorske disertacije je razvoj originalne metodologije za procenu rizika u radu sa opremom pod pritiskom, bazirane na mehanici loma i uticaju ljudskih i organizacionih faktora. Novopredložena metodologija zasnovana na sistematizaciji postojećih znanja iz oblasti procesne bezbednosti, inoviranja i integracije postojećih alata i modela za procenu rizika, kao i unapređenja oblasti mehanike loma i rada sa opremom pod pritiskom generalno, rešava glavne nedostatke u predmetnim oblastima, uz odlike jednostavnosti i prilagođavanja primeni u praksi, kao i problem nedostatka sistematičnog i praktičnog pristupa oceni uticaja ljudskih i organizacionih faktora na rizik...
PB  - Univerzitet u Beogradu, Mašinski fakultet
T1  - Integration of human and organizational factors in the risk and integrity assessment model for pressure equipment
T1  - Integracija ljudskih i organizacionih faktora u model procene rizika i integriteta opreme pod pritiskom
UR  - https://hdl.handle.net/21.15107/rcub_technorep_4671
ER  - 
@phdthesis{
author = "Golubović, Tamara",
year = "2018",
abstract = "The goal of this doctoral dissertation is establishing of an the original methodology for risk assessment of the pressure equipment, based on fracture mechanics, and influence of human and organisational factors. The methodology was based on systemisation of existing knowledge in the fields of process safety, inovation of existing tools and models for risk assessment, improvement of general pressure equipment exploitation and fracture mechanics, and solving the main disadvantages present in these areas, their simplification and adapting to practical application, with an emphasis on solving the issues related to a lack of a systematic and practical approach to determine influence of the human and organisational factors..., Predmet doktorske disertacije je razvoj originalne metodologije za procenu rizika u radu sa opremom pod pritiskom, bazirane na mehanici loma i uticaju ljudskih i organizacionih faktora. Novopredložena metodologija zasnovana na sistematizaciji postojećih znanja iz oblasti procesne bezbednosti, inoviranja i integracije postojećih alata i modela za procenu rizika, kao i unapređenja oblasti mehanike loma i rada sa opremom pod pritiskom generalno, rešava glavne nedostatke u predmetnim oblastima, uz odlike jednostavnosti i prilagođavanja primeni u praksi, kao i problem nedostatka sistematičnog i praktičnog pristupa oceni uticaja ljudskih i organizacionih faktora na rizik...",
publisher = "Univerzitet u Beogradu, Mašinski fakultet",
title = "Integration of human and organizational factors in the risk and integrity assessment model for pressure equipment, Integracija ljudskih i organizacionih faktora u model procene rizika i integriteta opreme pod pritiskom",
url = "https://hdl.handle.net/21.15107/rcub_technorep_4671"
}
Golubović, T.. (2018). Integration of human and organizational factors in the risk and integrity assessment model for pressure equipment. 
Univerzitet u Beogradu, Mašinski fakultet..
https://hdl.handle.net/21.15107/rcub_technorep_4671
Golubović T. Integration of human and organizational factors in the risk and integrity assessment model for pressure equipment. 2018;.
https://hdl.handle.net/21.15107/rcub_technorep_4671 .
Golubović, Tamara, "Integration of human and organizational factors in the risk and integrity assessment model for pressure equipment" (2018),
https://hdl.handle.net/21.15107/rcub_technorep_4671 .

Applicability of risk-based maintenance strategy to a penstock

Sedmak, Tamara; Bakić, Ramo; Sedmak, Stojan; Milović, Ljubica; Kirin, Snežana

(Society for Structural Integrity and Life, Institute for Material Testing, 2012)

TY  - JOUR
AU  - Sedmak, Tamara
AU  - Bakić, Ramo
AU  - Sedmak, Stojan
AU  - Milović, Ljubica
AU  - Kirin, Snežana
PY  - 2012
UR  - http://TechnoRep.tmf.bg.ac.rs/handle/123456789/2051
AB  - The risk of brittle fracture of the penstock of the reversible pump turbine is recognized in an early stage of design. To reduce the cost of penstock construction one tunnel is accepted. The HSLA steel of 700 MPa yield stress, 47 mm thick, is selected for the most stressed penstock section. It was necessary to assure structural integrity of welded joints and the penstock structure by involving an appropriate maintenance and repair approach. Maintenance procedures are in continuous development, and the most promising probably is the risk-based approach, developed recently. Basic requirements of this approach are considered in the paper, and the possibility and convenience to apply them for the penstock is evaluated.
AB  - Rizik od krtog loma cevovoda reverzibilne turbine je ocenjen u ranoj fazi projektovanja. Da bi se smanjili troškovi izgradnje cevovoda prihvaćen je jedan tunel. Zbog toga je za najopterećeniji segment cevovoda izabran HSLA čelik, 700 MPa napona tečenja, debljine 47 mm. Bilo je potrebno i da se osigura integritet zavarenih spojeva i konstrukcije cevovoda uvođenjem odgovarajućeg pristupa za održavanje i opravke. Postupci održavanja se neprekidno razvijaju, a možda su najperspektivniji postupci zasnovani na riziku, razvijeni poslednjih godina. U radu su razmotreni osnovni zahtevi novih pristupa, i ocenjena je mogućnost i pogodnost njihove primene na cevovod.
PB  - Society for Structural Integrity and Life, Institute for Material Testing
T2  - Integritet i vek konstrukcija
T1  - Applicability of risk-based maintenance strategy to a penstock
T1  - Strategija održavanja zasnovana na riziku - primenljivost na cevovod
EP  - 196
IS  - 3
SP  - 191
VL  - 12
UR  - https://hdl.handle.net/21.15107/rcub_technorep_2051
ER  - 
@article{
author = "Sedmak, Tamara and Bakić, Ramo and Sedmak, Stojan and Milović, Ljubica and Kirin, Snežana",
year = "2012",
abstract = "The risk of brittle fracture of the penstock of the reversible pump turbine is recognized in an early stage of design. To reduce the cost of penstock construction one tunnel is accepted. The HSLA steel of 700 MPa yield stress, 47 mm thick, is selected for the most stressed penstock section. It was necessary to assure structural integrity of welded joints and the penstock structure by involving an appropriate maintenance and repair approach. Maintenance procedures are in continuous development, and the most promising probably is the risk-based approach, developed recently. Basic requirements of this approach are considered in the paper, and the possibility and convenience to apply them for the penstock is evaluated., Rizik od krtog loma cevovoda reverzibilne turbine je ocenjen u ranoj fazi projektovanja. Da bi se smanjili troškovi izgradnje cevovoda prihvaćen je jedan tunel. Zbog toga je za najopterećeniji segment cevovoda izabran HSLA čelik, 700 MPa napona tečenja, debljine 47 mm. Bilo je potrebno i da se osigura integritet zavarenih spojeva i konstrukcije cevovoda uvođenjem odgovarajućeg pristupa za održavanje i opravke. Postupci održavanja se neprekidno razvijaju, a možda su najperspektivniji postupci zasnovani na riziku, razvijeni poslednjih godina. U radu su razmotreni osnovni zahtevi novih pristupa, i ocenjena je mogućnost i pogodnost njihove primene na cevovod.",
publisher = "Society for Structural Integrity and Life, Institute for Material Testing",
journal = "Integritet i vek konstrukcija",
title = "Applicability of risk-based maintenance strategy to a penstock, Strategija održavanja zasnovana na riziku - primenljivost na cevovod",
pages = "196-191",
number = "3",
volume = "12",
url = "https://hdl.handle.net/21.15107/rcub_technorep_2051"
}
Sedmak, T., Bakić, R., Sedmak, S., Milović, L.,& Kirin, S.. (2012). Applicability of risk-based maintenance strategy to a penstock. in Integritet i vek konstrukcija
Society for Structural Integrity and Life, Institute for Material Testing., 12(3), 191-196.
https://hdl.handle.net/21.15107/rcub_technorep_2051
Sedmak T, Bakić R, Sedmak S, Milović L, Kirin S. Applicability of risk-based maintenance strategy to a penstock. in Integritet i vek konstrukcija. 2012;12(3):191-196.
https://hdl.handle.net/21.15107/rcub_technorep_2051 .
Sedmak, Tamara, Bakić, Ramo, Sedmak, Stojan, Milović, Ljubica, Kirin, Snežana, "Applicability of risk-based maintenance strategy to a penstock" in Integritet i vek konstrukcija, 12, no. 3 (2012):191-196,
https://hdl.handle.net/21.15107/rcub_technorep_2051 .
1

Productivity after ownership transformation-serbian case

Dondur, Nikola; Spasojević-Brkić, Vesna; Omić, Snežana; Milović, Ljubica; Sedmak, Tamara

(Editura Stiintifica Fmr, Bucharest, 2012)

TY  - JOUR
AU  - Dondur, Nikola
AU  - Spasojević-Brkić, Vesna
AU  - Omić, Snežana
AU  - Milović, Ljubica
AU  - Sedmak, Tamara
PY  - 2012
UR  - http://TechnoRep.tmf.bg.ac.rs/handle/123456789/1995
AB  - Differences in total factor productivity of privatised and newly-founded private companies in Serbia are empirically estimated in this paper. On the panel data from a sample of 900 firms in three regions - Vojvodina, Central Serbia and Belgrade, it is found that majority foreign owned companies, as well as export-oriented and newly-founded businesses which did not undergo the process of ownership transformation recorded higher productivity than the average productivity in these regions. Regional inequality in companies' performance elasticity to foreign capital, exports and market concentration is also empirically proved.
PB  - Editura Stiintifica Fmr, Bucharest
T2  - Metalurgia International
T1  - Productivity after ownership transformation-serbian case
EP  - 57
IS  - 6
SP  - 50
VL  - 17
UR  - https://hdl.handle.net/21.15107/rcub_technorep_1995
ER  - 
@article{
author = "Dondur, Nikola and Spasojević-Brkić, Vesna and Omić, Snežana and Milović, Ljubica and Sedmak, Tamara",
year = "2012",
abstract = "Differences in total factor productivity of privatised and newly-founded private companies in Serbia are empirically estimated in this paper. On the panel data from a sample of 900 firms in three regions - Vojvodina, Central Serbia and Belgrade, it is found that majority foreign owned companies, as well as export-oriented and newly-founded businesses which did not undergo the process of ownership transformation recorded higher productivity than the average productivity in these regions. Regional inequality in companies' performance elasticity to foreign capital, exports and market concentration is also empirically proved.",
publisher = "Editura Stiintifica Fmr, Bucharest",
journal = "Metalurgia International",
title = "Productivity after ownership transformation-serbian case",
pages = "57-50",
number = "6",
volume = "17",
url = "https://hdl.handle.net/21.15107/rcub_technorep_1995"
}
Dondur, N., Spasojević-Brkić, V., Omić, S., Milović, L.,& Sedmak, T.. (2012). Productivity after ownership transformation-serbian case. in Metalurgia International
Editura Stiintifica Fmr, Bucharest., 17(6), 50-57.
https://hdl.handle.net/21.15107/rcub_technorep_1995
Dondur N, Spasojević-Brkić V, Omić S, Milović L, Sedmak T. Productivity after ownership transformation-serbian case. in Metalurgia International. 2012;17(6):50-57.
https://hdl.handle.net/21.15107/rcub_technorep_1995 .
Dondur, Nikola, Spasojević-Brkić, Vesna, Omić, Snežana, Milović, Ljubica, Sedmak, Tamara, "Productivity after ownership transformation-serbian case" in Metalurgia International, 17, no. 6 (2012):50-57,
https://hdl.handle.net/21.15107/rcub_technorep_1995 .