dc.description.abstractGoal, Scope and Background. This paper is a part of the research work on 'Integrated treatment of industrial wastes towards prevention of regional water resources contamination INTREAT' the project. It addresses the environmental pollution problems associated with solid and liquid waste/effluents produced by sulfide ore mining and metallurgical activities in the Copper Mining and Smelting Complex Bor (RTB-BOR), Serbia. However, since the minimum solubility for the different metals usually found in the polluted water occurs at different pH values and the hydroxide precipitates are amphoteric in nature, selective removal of mixed metals could be achieved as the multiple stage precipitation. For this reason, acid mine water had to be treated in multiple stages in a continuous precipitation system-cascade line reactor. Materials and Methods. All experiments were performed using synthetic metal-bearing effluent with chemical a composition similar to the effluent from open pit, Copper Mining and Smelting Complex Bor (RTB-BOR). That effluent is characterized by low pH (1.78) due to the content of sulfuric acid and heavy metals, such as Cu, Fe, Ni, Mn, Zn with concentrations of 76.680, 26.130, 0.113, 11.490, 1.020 mg/dm(3), respectively. The cascade line reactor is equipped with the following components: for feeding of effluents, for injection of the precipitation agent, for pH measurements and control, and for removal of the process gases. The precipitation agent was 1M NaOH. In each of the three reactors, a changing of pH and temperature was observed. In order to verify efficiency of heavy metals removal, chemical analyses of samples taken at different pH was done using AES-ICP. Results. Consumption of NaOH in reactors was 370 cm(3), 40 cm(3) and 80 cm(3), respectively. Total time of the experiment was 4 h including feeding of the first reactor. The time necessary to achieve the defined pH value was 25 min for the first reactor and 13 min for-both second and third reactors. Taking into account the complete process in the cascade line reactor, the difference between maximum and minimum temperature was as low as 6 degrees C. The quantity of solid residue in reactors respectively was 0.62 g, 2.05 g and 3.91 g. In the case of copper, minimum achieved concentration was 0.62 mg/dm(3) at pH = 10.4. At pH = 4.50 content of iron has rapidly decreased to lt 0.1 mg/dm(3) and maintained constant at all higher pH values. That means that precipitation has already ended at pH=4.5 and maximum efficiency of iron removal was 99.53%. The concentration of manganese was minimum at pH value of 11.0. Minimum obtained concentration of Zn was 2.18 mg/dm(3) at a pH value of 11. If pH value is higher than 11, Zn can be re-dissolved. The maximum efficiency of Ni removal reached 76.30% at a pH value of 10.4. Discussion. Obtained results show that efficiency of copper, iron and manganese removal is very satisfactory (higher than 90%). The obtained efficiency of Zn and Ni removal is lower (72.30% and 76.31%, respectively). The treated effluent met discharge water standard according to The Council Directive 76/464/EEC on pollution caused by certain dangerous substances into the aquatic environment of the Community. Maximum changing of temperature during the whole process was 6 degrees C. Conclusion. This technology, which was based on inducing chemical precipitation of heavy metals is viable for selective removal of heavy metals from metal-bearing effluents in three reactor systems in a cascade line. Recommendations and Perspectives. The worldwide increasing concern for the environment and guidelines regarding effluent discharge make their treatment necessary for safe discharge in water receivers. In the case where the effluents contain valuable metals, there is also an additional economic interest to recover these metals and to recycle them as secondary raw materials in different production routes.en
dc.publisherEcomed Publishers, Landsberg
dc.rightsrestrictedAccess
dc.sourceEnvironmental Science and Pollution Research
dc.subjectcascade line reactoren
dc.subjectchemical precipitationen
dc.subjecteffluenten
dc.subjectmetal-bearingen
dc.subjectheavy metals removalen
dc.subjectselective precipitationen
dc.titleSelective removal of heavy metals from metal-bearing wastewater in a cascade line reactoren
dc.typearticle
dc.rights.licenseARR
dc.citation.epage522
dc.citation.issue7
dc.citation.other14(7): 518-522
dc.citation.rankaM21
dc.citation.spage518
dc.citation.volume14
dc.identifier.doi10.1065/espr2006.09.345
dc.identifier.pmid18062485
dc.identifier.scopus2-s2.0-36349014201
dc.identifier.wos000250817500018
dc.type.versionpublishedVersion


Документи

Thumbnail

Овај документ се појављује у следећим колекцијама

Приказ основних података о документу